• <samp id="8zm9k"><tr id="8zm9k"><sub id="8zm9k"></sub></tr></samp>
    1. <ol id="8zm9k"></ol>

      亚洲精品一二三四区,成人嫩草研究院久久久精品,91老肥熟女九色老女人,国内精品大秀视频日韩精品,精品伊人久久久香线蕉,国产精品无码不卡在线播放,亚洲69视频,免费99视频
      Hotline:400-880-1556

      English




      [Change Notice] Notice on the change of the

      Author:中認聯科 time:2020-06-24 Ctr:2096

      Notice on the change of the "Safety Certification Rules for Transformers for Switching Mode Power Supplies" and the implementation of the new standard GB/T19212.17-2019

      Relevant certification companies:

      GB/T19212.17-2019 "Safety of transformers, reactors, power supply units and similar products with a power supply voltage of 1100V and below. Part 17: Special requirements and tests for switching power supply units and transformers for switching power supply units" in 2020 Implemented on May 1, 2014, this standard replaces GB19212.17-2013. GB/T19212.17-2019 implements GB/T19212.1-2016 "Safety of transformers, reactors, power supply units and their combinations Part 1: General requirements and tests" corresponding to the general standard. The following are all referred to as "new standards". The China Quality Certification Center revised the “Safety Certification Rules for Transformers for Switching Mode Power Supplies” according to the above-mentioned standard version changes. The newly issued certification rule number is CQC11-461214-2020, which replaces CQC11-461214-2015. Hereinafter referred to as the "new version of the rules".

      The matters related to the implementation of the certification business are now notified as follows:

      1. From the date of announcement, the switching power supply transformer shall be tested and certified in accordance with the new version of the standards and rules. 2. For products that have obtained the old version of the standard and rules certification, the certificate holder can submit a change application to our center and accept the test for the new and old standard difference test items (see the appendix for specific test items), and the test is qualified The new version of the standard and rules certification will be issued later. The certificate conversion work should be completed by April 30, 2021. Certificates that have not completed the conversion after the deadline will be suspended for 3 months. If it is not completed beyond the suspension deadline, the certificate will be revoked. 3. The follow-up inspection after certification is carried out according to the standards and rules listed in the valid certificate.

      annex:

      19212.1 New and old standard differences and supplementary tests.doc

      19212.17 Difference between new and old standards and supplementary test.doc

      Please click "https://www.cqc.com.cn/www/chinese/c/2020-05-26/556365.shtml" below to download the attachment

      China Quality Certification Center


      Related Articles
      • Air purifier exports to the EU | CE certification compliance guide, unlocking the market in 27 countries

      • Charger Export to the UK | UKCA Certification Compliance Guide, Key to Entry Post-Brexit

      • Label printer exports to the United States: Key compliance strategies for FCC certification, facilitating smooth entry into the market

      • Drones Export to Canada: Key Points for ISED Certification, Breaking Through Compliance Barriers

      Follow Us